Skip to content
Knowledgebase

Schedule maintenance and backups

Build a routine that avoids overlapping jobs and interrupted saves.

2 min read

Use available schedule actions

If Schedules is available, use its supported commands, power actions or backup tasks. Your backup quota and permissions still apply. A scheduled action does not create extra space or prove that a backup completed.

Plan a safe sequence

  1. Check the timezone used by the scheduling interface.
  2. Choose a quiet period and warn players.
  3. Run an announcement or supported save command first if needed.
  4. Allow the save or backup to complete before restarting.
  5. Test once and inspect the schedule history and console output.

Prevent overlapping work

Large worlds need longer to save and back up. Do not start another backup while one is running. Avoid combining automatic updates with an unverified backup process. Keep a known-good snapshot before changing versions.

For cron-style fields, inspect each minute, hour and day selection. A wildcard can run far more often than intended. Start with a simple routine you can observe and verify.

When a task fails

Check server state, task permissions, backup slots, storage and command validity. The scheduler may have executed while the game rejected a command. Inspect the game log as well as the schedule’s own status.

Still need a hand?

Send us your service ID and what you’ve tried so far.

Contact support